Shenzhen CPET Electronics Co., Ltd.

Manufacturer from China
Verified Supplier
1 Years
Home / Products / Automated Burn In Test Solutions /

Automatic Aging Test Equipment For TV Power Supply Photovoltaic Inverter

Contact Now
Shenzhen CPET Electronics Co., Ltd.
Visit Website
City:shenzhen
Country/Region:china
Contact Person:MrsAbner.li
Contact Now

Automatic Aging Test Equipment For TV Power Supply Photovoltaic Inverter

Ask Latest Price
Video Channel
Brand Name :CPET
Model Number :CPET-AT3888S03
Place of Origin :China
MOQ :2sets
Price :32000dollars/set
Payment Terms :L/C
Supply Ability :1sets/month
Delivery Time :48 work days
Packaging Details :Wooden case packing
Warranty :1 year
Equipment Size :1300*200*270cm
Equipment Weight :3000kg
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Automatic Aging Test Equipment For TV Power Supply Photovoltaic Inverter

Scope of application

Automatic Aging Test Equipment For TV Power Supply Photovoltaic Inverter

LED power supply, new energy OBC, PC power supply, server power supply, TV power supply, photovoltaic inverter, high-power industrial power supply, etc.

Outstanding functions

Automatic Aging Test Equipment For TV Power Supply Photovoltaic Inverter

1. Automatic operation mode, per hour capacity more than 1500 PCS
2. Automatic high pressure test, ATE test, burn-in test
3. Integration testing, no need to turn over, improve degree of automation
4. Multiple test station, save space, real-time monitoring, has the functions such as abnormal alarm stop
5. Commonality use, DC products with or without wire are applicable, the operation is simple and convenient,Using a large number of manipulator or transfer machine to replace artificial, high efficiency, for the expensive department, promote efficiency of up to 50%
Performance parameters
Automatic Aging Test Equipment For TV Power Supply Photovoltaic Inverter
Basic information Model Equipment Model CPET-AT3888S
Units Per Hour(UPH) 1600PCS/H or 56PCS/H
Product Power 5W~65W/CH or 1000W~3000W/CH
Equipment Size L=13000MM,W=2000MM,H=2700MM
Equipment Weight Around 3000kg
Related Information
of Burn-in line
Burn-in Room Capacity 3888PCS or 280PCS
Burn-in Time 2H
Burn-in Ply Number 9 floors
Transfer mode Similar with the burn-in mode of tridimensional storage/manipulator transportation/connector contact
Burn-in Line Temperature
Control system
Cooling Circulation Mode Forced air cooling:fan+frequency convertwe+air duct
Control Scope and
Precision

The temperature control scope:adjustable from room temperature to 60°C.The control precision is ±5°C

Temperature Rise Rate Able to rise to more than 45°C in 20 minutes
Burn-in Line Electronic
Control system
Product and Load Properties Optional
Load Properties Optional
Burn-in Voltage Input Support up to 6 voltages
Protection and Alarm

control power supply independently and added with protection and equpment including overheating and overload protection,earth leak

Hardware Demand Description

Independent computer host, display burn-instate, monitor output should be voltage, current,power and soon

Software Monitor Demand

Compile different Burn-in programs according to different products,realize voltage switching, impact, switching cycle, current setting, tem perature setting and other parameters

Burn-in Management Demand

The OK and NG judgment monitoring interface can directly understand that the data can be saved according to the required data format (TXT,EXCEL), which is convenient for query and download

Test Station Related
Information
Test Station Types

Install the product + electrified initial test + high voltage +ATE+ Burn-in +ATE+ take the product, automatic test Burn-in system, Unit combina

Test Mode Optional
Test Data Processing Optional
Test Instruments Optional
Connection Mod Optional
Burn-in & Test Jig Jig Size L500*W300*H30MM3 18 bits per vehicle or customized
Interface Mode AC: Universal socket; DC: USB or conventional DC female socket or customized
The Commmon Usage Shared by burn-in and test
Weright 1.5kg
Main Electric Control
System
Protection Equipment

Possessing independent and segmentation main switches.Having independent ground protection and electricity leakage protection

Power Demands According to the actual planning
Air source requirements 5-8KGF/CM3

Inquiry Cart 0